Library Digital Collections

During Leg 65 of the Deep Sea Drilling Project, technicians prepare last-minute adjustments on the downhole instrument package before it is attached to the heavy line seen on the reel after which the array was lowered to the sea floor. 1979.

During Leg 65 of the Deep Sea Drilling Project, technicians prepare last-minute adjustments on the downhole instrument pac...