Library Digital Collections

The Heave compensator located on the rack of the rig floor on the D/V Glomar Challenger (ship), part of the machinery using for drilling during the Deep Sea Drilling Project. 1976.

The Heave compensator located on the rack of the rig floor on the D/V Glomar Challenger (ship), part of the machinery usin...